How do Work Schedules interact with the Absence calendar?

All absences approved in the Absence calendar section will be exported to the Work Schedules section.

It is not possible to create a day off work from the Work Schedules section - do so from the Absence Calendar.

If a shift and an asbence are both pending for approval in the same day or one is planned over the other, the most recently approved time will override the day. For instance, if a shift is scheduled over a Rest day, the Rest day will be deleted and only a shift will be scheduled for that day.

SIA DeskTime O.Vaciesa street 6B, Riga, Latvia, LV-1004

© 2011 - 2020 DeskTime. All rights reserved.